Completed and ready to load up.
We test this Friday (9/21/2007) at Summit Point.
If the testing is successful I will run the MARRS Regional.
Finished view of Air intake incorporated into the Roll Hoop structure. This bit turned out very nice. Props also to my dad for fabricating an improvised engine cover in no time flat. Much prettier than that 'phallic' looking airbox and scoop hanging out of the hole in the top of the original bodywork...
Thursday, September 20, 2007
Aug 8th Progress Report
July 29
Water temp probe and header tank tap done using a prefab 'T' fitting from Pegasus.
Old Fuel pickup. It was so brittle that it fell apart in my hands as I tried to undo the fitting. Disaster averted (this time).
The fuel cell was remarkably easy to remove. This is the only way to do it...
Even then it was a realblind reach to set up the new pickup fitting
Old Fuel pickup. It was so brittle that it fell apart in my hands as I tried to undo the fitting. Disaster averted (this time).
The fuel cell was remarkably easy to remove. This is the only way to do it...
Even then it was a realblind reach to set up the new pickup fitting
Mid July Progress
Mid-July Progress
Beginnings of Cooling System Plumbing
Measuring Fuel Cell for PeterD pump
Subscribe to:
Posts (Atom)